OUR PROJECTS.

Forth Rail Bridge

In 2002 a contract to repaint the the bridge commenced with an estimated cost of £13 million a year.

Aircraft Carrier Alliance

The expertise of SIE was called upon to consult and design eqiupment to paint the the new aircraft carriers.

Edinburgh Waverley Station

Renovations of the stations steel work was required and SIE was called upon to supply the equipment required. 

Tay Bridge

At two miles long, the Tay Bridge is the longest railway bridge in the UK. SIE designed and built Vacuum recovery equipment for the task.

Offshore Structures

An investment of £20 million was made to create a new offshore wind farm manufacturing facilty on the River Tees.

Kings Cross Station

Five-year £500m redevelopment of King’s Cross station required extensive blasting and painting of the old steel structure.

Smulders Wallsend

A large scale bespoke LEV installation was designed, built and installed for the manufacture of offshore wind platforms.

Tinsley Viaduct

Three-year £82m project to strengthen the complex steel structure that carries M1 over the Don Valley in Sheffield.

Newcastle Steel Company

Design and manufacture of a full abrasive blasting and paint spraying installation with a 22 tonne capacity.

Have a Project in Mind?

Let’s Get it Moving

Contact Us

Faraday House, Station Road, Washington NE38 7LW

+44 0191 4165127

info@sie-industrial.co.uk